文档介绍:ABSTRACT
ABSTRACT
By the open area power work construction and transformation of "115"
,there is a certain degree of ascension in the grid structure, power supply capacity at present,with the development of economy,the open area of power work can not adapt to the load demand of development,existing problems such as the weak structure
,the preparation of the open area powr work"125"planning report,guiding by the open area in the construction of power work, the open area has important significance of power work for providing power supply service quality of regional economic and social development and improve people's living standards.
The planning to guide the transformation of the open area by the construction of 110kV and below power work,ensure coordination at all levels of work and the development of social economy;optimization by the open area grid structure levels of power work,the improvement the week of 10kV and above power distribution grid;meet the load demand.
Key Words: Power work; construction Planning; increase for load demand; grid structure; power systems
目录
第一章 前言................................................................................................................................... 1
编制目的和意义................................................................................................................................. 1
规划指导思想...................................................................................................................................... 1
规划范围和年限.................................................................................................................................. 1
供电区划分......................................................................................................................................... 2
第二章经济社会发展概况........................................................................................................... 3
总体情况........................