文档介绍:PARK HYATT SAIGON HOTEL PROJECT
STANDARD OPERATION PROCEDURE NO :
SOP-PJ-01 ( Page 1/2 )
WORK TITLE :
Application for Factory Permit
APPROVED BY :
Head, Control Dept
CHECKED BY :
PROJECT MANAGER
REVISION : A
EFFECTIVE DATA :
WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA
NA
REFERENCE STANDARDS/ CODES & QUALITY PLAN :
ply with the Factory Act
FACILITIES /INSPECTION INSTRUMENT :
NA
ENVIRNMENT CONTROLS :
NA
NECESSARY RECORDS :
Form for Factory Permit
Orientation Course Certificate of Workers
FREQUENCY :
One time per project before site possession
SPECIAL REQUIREMENTS :
NA
SAFETY & HEALTH REQUIREMENTS
Safety Orientation Course for workers
WORK PROCEDURE
CHECKING METHOD
REMEDIAL MEASURE
RESPONSIBILITY
Project Manager
Engineer
Foreman
Assistant Foreman
Trade Worker
Checker
Subcon
Quantity Surveyor
1. Collect relevant form from the Ministry of Labor
2..Gather information from Project Manager on the number of workers staying on/off site, name of Safety Office , First Aider and whether the use of tower crane is necessary
tower crane is to be used, gather information from Project Manger ,the name of the operator and the manufacture ‘s details of the crane to be used
from the Labour Recruitment and Management section copies of the SOC of workers of the number of the workers staying on site
up the said forms and submit with covering letter to the Ministry of Labour.
NA
Verify against contractual documents
Verify with Project Manager
Check with Labour Recruitment and Management Section
Check that all necessary requirements are fulfilled.
NA
NA
NA
NA
Obtain any document or information not present
F
F
F
F
A
P
P
P
P
P
File : PJ -01 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK
PARK HYATT SAIGON HOTEL PROJECT
STANDRAND OPERATION PROCEDURE NO :
Sop-PJ-01 ( Page 2/2 )
WORK TITLE :
Application for Factory Permit
APPROVED BY :
Head, Co