文档介绍:该【电柜元件安装配线图例 】是由【海洋里徜徉知识】上传分享,文档一共【18】页,该文档可以免费在线阅读,需要了解更多关于【电柜元件安装配线图例 】的内容,可以使用淘豆网的站内搜索功能,选择自己适合的文档,以下文字是截取该文章内的部分文字,如需要获得完整电子版,请下载此文档到您的设备,方便您编辑和打印。(完整word版)电柜元件安装配线图例
(完整word版)电柜元件安装配线图例
不排除由于是进行产品质量评审时,在项目的设置、抽样方法与质量检验的严谨程度上,都尚存在一定的问题;所以产品评审的过程需要进一步改进;以便更真实地反映情况出产品的真实问题;从而更全面、更本质地反映产品质量存在的问题与真实水平center pin checks and anchoring the inner cylinder. According to While coupling alignment should keep oil out of cavity and locate the rotor axis neck raised are within the prescribed limits, there should be no gaps, Horn, Horn and Horn feeler gauges fit into. Center coupling, condenser water filling and water-filled according to factory requirement. For coupling three supported rotor Center, the mouth under the coupling between the value should be as stipulated in the manufacturer, usually ~. In the case of coupling connection, if possible, lifting only one bearing end of the support bearing of the rotor, remove the bearing, fitted with special tiles and special lifting tools, disc rotors, check the journal flutter tile, should generally be less than . When the couplings and rotor comes when there is a conflict, the coupling Centre shall prevail. shaft looking for: ... . Provisional bolt confirmed the positioning of the rotor size, as well as the coupling between the adjustment shim thickness accuracy, drawings to meet the technical requirements. Plane, cylindrical and clean the coupling bolt holes should be clean and without burrs, scrap iron and grease-free, relative position of the coupling according to the drawing requirements are. Coupling top screws, round distance apart, indicators to monitor movement of the aircraft, its value is allowed to pass the value axis moving, mounted adjustment pads, note pads installation direction guide pin coupling with process end closed. The back wheels slowly tightened, when 2mm or so, with standard white bars where two back wheel bolt hole measurement above and below, confirm two back wheel bolt hole concentricity. Then, the symmetrical horizontal mount two temporary bolts tightened, attention to monitor dial indicator, then install the symmetrical temporary bolts, this time sites slowly moving rotor, in the measured circumference of 8 equal parts back wheel rim rock, each measuring relative changes in value should be less than . coupling reamed and paired bolt reaming die reamer, adjustable reamers, boring mill, in several ways. General requirements before reaming or boring,
不排除由于是进行产品质量评审时,在项目的设置、抽样方法与质量检验的严谨程度上,都尚存在一定的问题;所以产品评审的过程需要进一步改进;以便更真实地反映情况出产品的真实问题;从而更全面、更本质地反映产品质量存在的问题与真实水平center pin checks and anchoring the inner cylinder. According to While coupling alignment should keep oil out of cavity and locate the rotor axis neck raised are within the prescribed limits, there should be no gaps, Horn, Horn and Horn feeler gauges fit into. Center coupling, condenser water filling and water-filled according to factory requirement. For coupling three supported rotor Center, the mouth under the coupling between the value should be as stipulated in the manufacturer, usually ~. In the case of coupling connection, if possible, lifting only one bearing end of the support bearing of the rotor, remove the bearing, fitted with special tiles and special lifting tools, disc rotors, check the journal flutter tile, should generally be less than . When the couplings and rotor comes when there is a conflict, the coupling Centre shall prevail. shaft looking for: ... . Provisional bolt confirmed the positioning of the rotor size, as well as the coupling between the adjustment shim thickness accuracy, drawings to meet the technical requirements. Plane, cylindrical and clean the coupling bolt holes should be clean and without burrs, scrap iron and grease-free, relative position of the coupling according to the drawing requirements are. Coupling top screws, round distance apart, indicators to monitor movement of the aircraft, its value is allowed to pass the value axis moving, mounted adjustment pads, note pads installation direction guide pin coupling with process end closed. The back wheels slowly tightened, when 2mm or so, with standard white bars where two back wheel bolt hole measurement above and below, confirm two back wheel bolt hole concentricity. Then, the symmetrical horizontal mount two temporary bolts tightened, attention to monitor dial indicator, then install the symmetrical temporary bolts, this time sites slowly moving rotor, in the measured circumference of 8 equal parts back wheel rim rock, each measuring relative changes in value should be less than . coupling reamed and paired bolt reaming die reamer, adjustable reamers, boring mill, in several ways. General requirements before reaming or boring,1
(完整word版)电柜元件安装配线图例
不排除由于是进行产品质量评审时,在项目的设置、抽样方法与质量检验的严谨程度上,都尚存在一定的问题;所以产品评审的过程需要进一步改进;以便更真实地反映情况出产品的真实问题;从而更全面、更本质地反映产品质量存在的问题与真实水平center pin checks and anchoring the inner cylinder. According to While coupling alignment should keep oil out of cavity and locate the rotor axis neck raised are within the prescribed limits, there should be no gaps, Horn, Horn and Horn feeler gauges fit into. Center coupling, condenser water filling and water-filled according to factory requirement. For coupling three supported rotor Center, the mouth under the coupling between the value should be as stipulated in the manufacturer, usually ~. In the case of coupling connection, if possible, lifting only one bearing end of the support bearing of the rotor, remove the bearing, fitted with special tiles and special lifting tools, disc rotors, check the journal flutter tile, should generally be less than . When the couplings and rotor comes when there is a conflict, the coupling Centre shall prevail. shaft looking for: ... . Provisional bolt confirmed the positioning of the rotor size, as well as the coupling between the adjustment shim thickness accuracy, drawings to meet the technical requirements. Plane, cylindrical and clean the coupling bolt holes should be clean and without burrs, scrap iron and grease-free, relative position of the coupling according to the drawing requirements are. Coupling top screws, round distance apart, indicators to monitor movement of the aircraft, its value is allowed to pass the value axis moving, mounted adjustment pads, note pads installation direction guide pin coupling with process end closed. The back wheels slowly tightened, when 2mm or so, with standard white bars where two back wheel bolt hole measurement above and below, confirm two back wheel bolt hole concentricity. Then, the symmetrical horizontal mount two temporary bolts tightened, attention to monitor dial indicator, then install the symmetrical temporary bolts, this time sites slowly moving rotor, in the measured circumference of 8 equal parts back wheel rim rock, each measuring relative changes in value should be less than . coupling reamed and paired bolt reaming die reamer, adjustable reamers, boring mill, in several ways. General requirements before reaming or boring,
电气控制柜元件安装接线配线图例
   1 元器件安装
     1。1 前提:所有元器件应按制造厂规定的安装条件进行安装。
     􀂃 适用条件
     􀂃 需要的灭弧距离
     􀂃 拆卸灭弧栅需要的空间等,对于手动开关的安装,必须保证开关的电弧对操作者不产生危险
     组装前首先看明图纸及技术要求
     1。3 检查产品型号、元器件型号、规格、数量等与图纸是否相符
     1。4 检查元器件有无损坏
     必须按图安装 (如果有图)
     元器件组装顺序应从板前视,由左至右,由上至下
     同一型号产品应保证组装一致性
     1。8 面板、门板上的元件中心线的高度应符合规定
     元件名称 安装高度(m)
     指示仪表、指示灯 0。6—2。0
     电能计量仪表 0。6—
     控制开关、按钮 —2。0
     紧急操作件 0。8—1。6
     组装产品应符合以下条件:
     􀂃 ,不应受到空间的防碍,不应有触及带电体的可 能.
     􀂃 。
     􀂃 各种电气元件和装置的电气间隙、爬电距离应符合4。4 条的规定.
     􀂃 保证一、二次线的安装距离。
     组装所用紧固件及金属零部件均应有防护层,对螺钉过孔、边缘及表面的毛刺、尖锋应打磨平整后再涂敷导电膏。
     1。10 对于螺栓的紧固应选择适当的工具,不得破坏紧固件的防护层,并注意相应的扭距.
     主回路上面的元器件,一般电抗器,变压器需要接地,断路器不需要接地,下图中为电抗器接地.
    
    
     1。12 对于发热元件 (例如管形电阻、散热片等) 的安装应考虑其散热情况,安装距离应符合元件规定。    
(完整word版)电柜元件安装配线图例
(完整word版)电柜元件安装配线图例
不排除由于是进行产品质量评审时,在项目的设置、抽样方法与质量检验的严谨程度上,都尚存在一定的问题;所以产品评审的过程需要进一步改进;以便更真实地反映情况出产品的真实问题;从而更全面、更本质地反映产品质量存在的问题与真实水平center pin checks and anchoring the inner cylinder. According to While coupling alignment should keep oil out of cavity and locate the rotor axis neck raised are within the prescribed limits, there should be no gaps, Horn, Horn and Horn feeler gauges fit into. Center coupling, condenser water filling and water-filled according to factory requirement. For coupling three supported rotor Center, the mouth under the coupling between the value should be as stipulated in the manufacturer, usually ~. In the case of coupling connection, if possible, lifting only one bearing end of the support bearing of the rotor, remove the bearing, fitted with special tiles and special lifting tools, disc rotors, check the journal flutter tile, should generally be less than . When the couplings and rotor comes when there is a conflict, the coupling Centre shall prevail. shaft looking for: ... . Provisional bolt confirmed the positioning of the rotor size, as well as the coupling between the adjustment shim thickness accuracy, drawings to meet the technical requirements. Plane, cylindrical and clean the coupling bolt holes should be clean and without burrs, scrap iron and grease-free, relative position of the coupling according to the drawing requirements are. Coupling top screws, round distance apart, indicators to monitor movement of the aircraft, its value is allowed to pass the value axis moving, mounted adjustment pads, note pads installation direction guide pin coupling with process end closed. The back wheels slowly tightened, when 2mm or so, with standard white bars where two back wheel bolt hole measurement above and below, confirm two back wheel bolt hole concentricity. Then, the symmetrical horizontal mount two temporary bolts tightened, attention to monitor dial indicator, then install the symmetrical temporary bolts, this time sites slowly moving rotor, in the measured circumference of 8 equal parts back wheel rim rock, each measuring relative changes in value should be less than . coupling reamed and paired bolt reaming die reamer, adjustable reamers, boring mill, in several ways. General requirements before reaming or boring,
不排除由于是进行产品质量评审时,在项目的设置、抽样方法与质量检验的严谨程度上,都尚存在一定的问题;所以产品评审的过程需要进一步改进;以便更真实地反映情况出产品的真实问题;从而更全面、更本质地反映产品质量存在的问题与真实水平center pin checks and anchoring the inner cylinder. According to While coupling alignment should keep oil out of cavity and locate the rotor axis neck raised are within the prescribed limits, there should be no gaps, Horn, Horn and Horn feeler gauges fit into. Center coupling, condenser water filling and water-filled according to factory requirement. For coupling three supported rotor Center, the mouth under the coupling between the value should be as stipulated in the manufacturer, usually ~. In the case of coupling connection, if possible, lifting only one bearing end of the support bearing of the rotor, remove the bearing, fitted with special tiles and special lifting tools, disc rotors, check the journal flutter tile, should generally be less than . When the couplings and rotor comes when there is a conflict, the coupling Centre shall prevail. shaft looking for: ... . Provisional bolt confirmed the positioning of the rotor size, as well as the coupling between the adjustment shim thickness accuracy, drawings to meet the technical requirements. Plane, cylindrical and clean the coupling bolt holes should be clean and without burrs, scrap iron and grease-free, relative position of the coupling according to the drawing requirements are. Coupling top screws, round distance apart, indicators to monitor movement of the aircraft, its value is allowed to pass the value axis moving, mounted adjustment pads, note pads installation direction guide pin coupling with process end closed. The back wheels slowly tightened, wh