文档介绍:电力工程论文发表
Abstract: in order to improve the poent benefits, the investment management of the construction project, this paper discusses the portance of engineering cost control and its influencing factors. The value engineering and technical and economic theory respectively, the project investment decision, design and construction each stage of the investment control key and difficulty of the thinking and analysis, and points out that the project cost management personnel in the actual anagement aspect, suggested that in the construction project engineering cost management and control should actively promote petition and market pricing mechanism.
Keyent control
摘要:电力工程论文为了提高电力建设项目的投资效益,从投资管理的角度论述了建设项目全过程工程造价控制的重要性及其影响因素。采用价值工程和技术经济理论,分别对项目投资的决策、设计及施工各阶段投资控制的重点和难点进行了剖析和思考,指出了工程造价管理人员在实际工作中应重点注意和切实加强管理的方面,建议在建设项目工程造价的管理和控制中应积极推行竞争和以市场定价的机制。
关键词:电力建设项目;工程造价;管理控制

从1995年国家计委提出对建设项目控制工程造价以来,我国电力建设项目的工程造价控制工作取得了一定的成绩。但就目前的体制和现实而言,对工程造价的管理和控制,预算人员根据已经确定的图纸计算工程量、套用定额、计取费用,或在施工结束后根据图纸和施工组织设计以及现场施工签证记录等资料编制竣工决算。当概预算人员编制概预算或竣工决算时,建设方案和设计图纸都已确定,而施工是以按图施工为原则,因此预决算人员所做的工作只是计算变更所产生的费用变化以及防止高估冒算。假如:项目在经济上不合理、决策存在失误;设计方案在技术上不可行或不是最优;施工组织设计或通过招投标确定的承包合同价不合理或不经济等,则预决算人员无能为力。现行体制下,预决算人员的工作只是事后算账,只能消极地反映已完工程的造价及被动地反映设计和施工所花的费用。因此,要想有效地控制建设项目的工程造价,提高工程建设的投资效果,必须进行事先、主动且贯穿于项目建设全过程的工程造价控制,即从项目决策阶段的投资估算到设计阶段的设计概算、实施阶段的承包合同价及工程完工后的竣工决算。
1 影响工程造价的主要因素
项目的建设规模任何一个建设项目都应选择合理的建设和生产规模。规模过小,资源得不到有