文档介绍:摘要
施工组织设计是指导施工准备和施工全过程的全面的技术经济文件,施工方案的变动会影响到施工图预算价格的变化。因此,施工企业应重视施工组织设计的编制工作;项目业主应当重视施工组织设计的评审、监督。这就要求我们必须要进行广泛而深入的调研活动。这里的调研活动,就是我们讲的施工组织设计和方案的编制。施工组织设计作为主导施工的依据,包括以下几个方面的内容:编制依据、工程概况、施工部署、施工准备、施工进度计划、施工平面布置、拟投入本工程资源计划、总承包管理协调配合方案、主要分部(分项)工程施工技术方案、专项施工方案和施工组织各项管理保证措施。编制时对目标工期、工程质量、项目管理机构设置、劳动力组织、施工进度计划控制、机械设备及周转材料配备、主要分部分项工程施工方法、安全保证措施、文明施工及环境保护措施、降低成本措施等诸多因素尽可能充分考虑,突出科学性及可行性。
【关键词】:组织设计施工管理现场控制
Abstract:
The anization plan is instructs the construction to prepare and to construct the entire prehensive technical economy document, the plan of construction change can affect the construction drawing budgetary price , the construction enterprise should take the anization plan the establishment work; The project owner must take the anization plan the appraisal, the surveillance. This requests us to probably carry on widespread and thorough investigation and study. Here investigation and study refers to what we talked about the construction design and preparation of the programmes. The construction design as the basis for leading the construction, consists of the following parts: foundation, project profiles, construction plans, construction preparation, construction schedule, construction layout, preinvested resource planning in the project, coordination of contract management Programme, the main divisions (sub-) construction technology programmes, special programmes and construction management of the anization guarantees. Establishment of the target should focus on the following aspacts: quality, project management institutions, anizations, the construction schedule control, mechanical equipment and working with materials, the main part of the construction methods, security guarantees, and civilized construction and environmental protection measures, lower costs Measures and other factors considered as fully as possible, highlighting its scientific dicspline and feasibility.
Key words : organization planning, construction management , on site const