文档介绍:迁钢三期转炉炼钢屋顶除尘及除尘设备设计  
2013-03-10 08:22:37|  分类: 通风环保论文汇集|字号 订阅
  
本文发表于《工程与技术》2010年第1期 
迁钢三期转炉炼钢屋顶除尘及除尘设备设计
                         胡学毅
        (北京首钢国际工程技术有限公司动力设计室,北京10043)
 
摘要 本文介绍了首钢迁钢转炉炼钢三期工程设计的一套屋顶除尘系统,该系统在两台转炉的氧枪通道上部分别设有屋顶吸尘罩,通过调节阀控制抽吸风量可以有效捕集屋顶散烟;捕集的烟气通过管道进入地面站的大单元脉冲布袋除尘器得以净化。文中还对所采用的除尘器结构布置和基本计算进行了较为详细的介绍。
关键词 转炉炼钢  屋顶除尘  吸尘罩 大单元脉冲除尘器
The Third Period converter Steelmaking Workshop Roof Dust Collection & its Equipment Design for Qian An plex
                       Hu Xueyi
 (BSIET  Ironmaking  Technology Section , Beijing 100043)
Abstract: This paper introduced a set of workshop roof dust collection system designed for the third period 转炉 steelmaking engineering of Shou Gang Qian An Steel Coplex. The system equipped 2 roof dust suction hoods in the upsides of passes of 2 sets of  converter oxygen guns and could collect the fugitive smoke and fume efficiently in the workshop’s roof by controlling adjustable valves and drawing gas volume. The collected gas has been drawn through the main pipe into the pulsed cleaning baghouse with big units in the dedusting station and been cleaned. The construction arrangement and design of the special baghouse have been explained. There are 7 figures. 
Keywords: converter steelmaking,  workshop roof dust collection,  drawing dust hood,
pulsed cleaning baghouse with big units
 
一、  概述
首钢迁钢炼钢三期工程由2台210 t转炉组成。转炉烟尘治理在总结一、二期工程的基础上进行了技术提升,主要表现在二次除尘风量的控制方面。三期工程的转炉一次除尘采用干法电除尘器,转炉二次除尘增加了倒铁水站下部的除尘并加高了除尘罩,二次除尘整体风量增加到380万m3/h(其中包括精炼风量40万m3/h)。与此相比,一、二期3台210 t 转炉二次除尘总风量才为370万m3/h。同时为了保证在转炉吹炼不正常时,从氧气枪孔和转炉密封罩内逸出的烟尘在出屋顶前能被捕集,避免排放到大气中污染环境,炼钢三期工程还增加了转炉的屋顶除尘系统,2台转炉的屋顶捕集总风量设计为100万m3/h。下面着重介绍转炉屋顶除尘系统及采用的大型脉冲布袋除尘器的设计。
二、  屋顶除尘系统的工艺布置及设计参数
1.             屋顶吸尘罩和除尘器布置
2台转炉各自的屋顶吸尘罩布置在转炉跨的上部,每个罩长27m,宽12 m,高约7 m。 m,位于氧枪通道和转炉兑铁水位置的上部,具体布置见图1 。
图1 转炉屋顶吸尘罩的布置图
1-屋顶吸尘罩;2-调节阀;3-屋顶除尘管;4-转炉二次吸尘罩;5-转炉
三期工程改造的部分是:取消原转炉上的天窗,如图所示在厂房最高处形成捕集罩。罩的位置可以最有效的捕集兑铁水和吹炼时通过氧枪通道排到屋顶的散烟。捕集的烟尘通过吸尘罩一侧的风管排出,风管的截面尺寸为4000×3000。风管上设有4000×3000的电