1 / 15
文档名称:

VPT JQE Guideline (Rev00).ppt

格式:ppt   大小:606KB   页数:15页
下载后只包含 1 个 PPT 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

VPT JQE Guideline (Rev00).ppt

上传人:文库旗舰店 2018/6/8 文件大小:606 KB

下载得到文件列表

VPT JQE Guideline (Rev00).ppt

相关文档

文档介绍

文档介绍:JQE Program Guideline
Jan 1, 2007
Purpose & Requirements of a JQE
The role of the Joint Quality Engineer (JQE) is to serve as a supplier representative and jointly works with Flex/IDW’s SQE in order to achieve joint ess in achieving supplier quality goals.
The JQE is responsible for driving quality improvements at his/pany for Flex/IDW parts and preparation for new products
A JQE uses documentation tools and submits regular reports to the respective Flex/IDW SQE for review.
Probation Period - 3 months to determine if the candidate is suitable. During this period, the JQE will be assessed based on parison scores between a Self-Audit Assessment and a Audit Assessment conducted by Flex/IDW SQE. If gap between these 2 scores are less than 5%, the JQE can be certified.
Elements of the JQE Guideline
JQE Annual Action Plan
Daily Report (Supplier Manufacturing)
Weekly Report (Supplier Manufacturing)
Monthly Report (Supplier Manufacturing)
JQE Monthly report (Activity & Performance summary)
Advanced Quality Planning (AQP)
PMP
PFMEA
Process Flow Diagram
PPAP
Quality System Audit and Quality Process Audit
Others (Part matrix and JQE Contact list)
JQE Annual Action Plan
The Plan outlines the task of JQE for the fiscal year follow Flex/IDW calendar year which starts April
Submitted annually on 15 March
Major revisions allowed before each quarter
Submission deadline is 15 working days before start of quarter
Progress tracking - Update and submit to Flex/IDW SQE by 10th day of each month
Each update must put in rev # and date in the plan
File name to be: JQE_AnnualActionPlan_FY07_(suppliername)_(mfgsite)_(rev)_(yearmonthday)
JQE Daily Report
RTY and OBA Report
Update daily on product quality performance at supplier site
Applicable :-
1st 30 days of new product manufacturing after AQP Review
Product with excursion in Flex/IDW manufacturing lines
Send to Flex/IDW SQE by 12 pm for previous day’s production yield
E-mail notification must include the summary of the yie