文档介绍:Sichuan Urban Deyang Wastewater
Treatment Work
Installation of Mechanical Equipment
anization
China Second Metallurgical Construction Corporation Limited
Date: Jun. 10th , 2003
List of contents
Ⅰ、 General
Ⅱ、 Standards and codes of Installation
Ⅲ、 anization
Ⅳ、 The plan of labor force
Ⅴ、 Plan for machines and fools
Ⅵ、 Progress of construction
Ⅶ、 Construction scheme
Ⅷ、 Measures for finishing project on time
Ⅸ、 Measures of assuring quality
Ⅹ、 Measures for safety and civilization construction
ⅩⅠ、 Winter and weather protection measures
ⅩⅡ、 Temporary Installation Layout
The explanation piling
1. Compiling in accordance with:
The anization is in accord with the tender document and designing drawings of Sichuan urban Deyang wastewater treatment work
This document is in accord with related technical document issued standard and codes, refer to the experiences for similar projects and the abilities of pany.
In accordance with 《management standards for construction projects quality》issued by china.
In accordance with《management standards for construe unction projects 》.
The national professional codes for construction project quality
The national, professional acceptance codes for construction projects
《quality system and document》 and《quality manuals》 are used in pany, The time of work will satisfy the owner’s requirement.
Ⅰ、Brief Introduction to the project
Sichuan Deyang wastewater Treatment works is located in lithe village, DeYang city the west bank of MianYun Ribver sichuan Province, the people’s Republic of China, DeYang wastewater waste water works is pletely two-stage biochemical treatment works, The overall scale planned for DeYang wastewater Treatment works is 250,000m3/d,of which the scale of this stage is 100,000 m3/d,The Treatment process of the wastewater treatment work is a two stage biochemical treatment based mainly on dual oxidation ditches process, The Treatment of sludge is :The sur