1 / 176
文档名称:

多高层房屋钢结构节点连接设计中的常见问题.ppt

格式:ppt   大小:14,186KB   页数:176页
下载后只包含 1 个 PPT 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

多高层房屋钢结构节点连接设计中的常见问题.ppt

上传人:wz_198613 2018/8/2 文件大小:13.85 MB

下载得到文件列表

多高层房屋钢结构节点连接设计中的常见问题.ppt

相关文档

文档介绍

文档介绍:Wire drawing
Vermeulen Dirk
R#KLPAA/06/197
Basic principle
To reduce the diameter of the wire:
! the volume(mass) of the wire remains the length increases the diameter is reduced
V0 = V1
V0
V1
d0
d1
L0
L1
Flow of the material
how
The deformation is done in a die
Here there is the deformation but also friction
power
Force
power
All used power is converted into:
90 to 95% to the deformation of the wire =
heat 10 to 5% in residual stresses
A drawing machine is huge heat exchanger
Cooling is the name of the game
Deformation
Inhomogeneous deformation, shear loss, redundant work
 2
Friction loss
µ
 contact length
Homogenous deformation
 reduction
Deformation
Inhomogeneous deformation, shear loss, redundant work
 2
Drawing force graph
..\PDF\boekje RV
power
To have sufficient force to draw the wire through the die we need POWER
Power : comes from electric motor
How much power??? Depends on:
Amount of deformation(= reduction or elongation) to versus to
Strength of the wire HICA (%C) versus LOCA (%C)
Speed 1m/sec versus 20 m/sec
Friction in the die ( lubricant, coating die angle..)
examples
wire rod drawn to ***@2 m/sec LOCA (%C )needs : HICA (%C) needs :
Wire drawn to @ 20m/sec LOCA (%C) needs : HICA (%C) needs : kW