自动发电控制是能量管理系统中的一项基本功能,在保证电网频率质量和联络线交换功率恒定等方面发挥着至关重要的作用。随着电网规模的不断扩大和自动化水平的不断提高,具备自动发电控制功能的机组在电网中的比重越来越大,自动发电控制技术己成为现代电网运行中不可缺少的调整手段。
本文针对火电厂负荷优化组合分配的特点,提出了以一个调度周期内发电厂费用总和最小值为目标函数,包含负荷需求限制、单机输出功率上下限、机组最大允许启停次数、机组最小连续运行时间等约束条件的数学模型。通过对优化问题的研究,以优化算法为载体,来实现优化问题。
关键词:自动发电控制,机组组合,负荷分配,优化算法
Abstract
Automation generation control (AGC) is an important function in energy management system (EMS). The size of power grids extending and automation level increasing, the proportion of AGC unites in power grids is bigger and bigger. And the automation generation control technology is an indispensable means in modern power grids running.
To meet the demand of the characters of optimizing mitment (UC), this paper chooses a minimum total cost of scheduling cycle power plant as the objective function, taking constraint function into account, such as the demand constraint, generation capacity limits, ramp rate limits, maximum allowable start and stop times limits, the minimum uptime and downtime limits, unit and stop state limits and etc. Setting optimize algorithm as the carrier to achieve optimization through the research on optimization problems.
朗读
显示对应的拉丁字符的拼音
字典
Key Words: Automatic Generation Control, mitment, Load Dispatch, Optimization Algorithm
目录
1 绪论 1
研究背景 1
自动发电控制(AGC)概述 1
电网安全运行中的自动发电控制 2
电网经济运行下的自动发电控制 3
AGC的研究发展趋势 3
本论文的主要工作 4
2 自动发电控制的原理 5
电力系统频率控制原理 5
自动发电控制的一般过程 6
AGC的调节目标 8
自动发电控制的基本控制目标 8
自动发电控制的调节目标 8
自动发电控制软件功能 9
自动发电控制中ACE的计算 9
自动发电控制方式 9
ACE调节量的计算 10
目前常用AGC机组的控制策略 11
等额平均法 11
等可调比例法 11
基于费用优化的控制策略 12
3 AGC机组优化组合原理及其数学模型 14
AGC机组优化组合的原理 14
传统的机组组合模型 15
目标函数 15
约束条件 15
机组优化组合数学模型 17
电力市场环境下的AGC调节容量问题 17
目标函数 18
约束条件 18
4 动态规划法求解机组组合分配问题 20
动态规划的一些基本概念 20
动态规划的基本定理 21
动态规划的基本算法 22
动态规划法在机组组合中的应用 24
反向算法在机组组合中的应用 24
前向算法在机组组合中的应用 24
算例分析 27