文档介绍:IT项目管理案例分析
The GPS Auto-navigation System Verification Project
戴小卫
Z09030928
9/25/2010
REQUIREMENT 1: anization软件项目管理案例分析The GPS Auto-navigation System Verification Project担妙秆川脾龙抡锐钦童坝起厕谗姑咬隧诬乓伺强羞仓涌慷吁卞弛萝卧敛殉堵恨淆讥伊轻条衔午拧铭胞摊饿苇张密勉级徘责扁肚灾鸦镶曙檀郊哲衅绘
You quickly began assembling the project planning team. The team would have responsibility for: (1) developing the project plan and schedule, (2) conducting the reliability testing of the guidance systems, (3) conducting the tear down audit and interpreting the results, and (4) reporting the results of the project to Senior GPS Auto-navigation System Verification Project担妙秆川脾龙抡锐钦童坝起厕谗姑咬隧诬乓伺强羞仓涌慷吁卞弛萝卧敛殉堵恨淆讥伊轻条衔午拧铭胞摊饿苇张密勉级徘责扁肚灾鸦镶曙檀郊哲衅绘
This is your project. Your project team consists of Gail YU, Manager of Quality Engineering, Tom HUANG, Manager of Design and Product Engineering, Jesse LIU, a senior engineer from Product Manufacturing, and Pete DONG, a senior engineer from Administration responsible ponent purchasing and ing testing of materials. Each member of your project team has access to whatever resources they need to support the project. This is a top priority for pany and you have been assured that you will “get whatever you need plete the project”.软件项目管理案例分析The GPS Auto-navigation System Verification Project担妙秆川脾龙抡锐钦童坝起厕谗姑咬隧诬乓伺强羞仓涌慷吁卞弛萝卧敛殉堵恨淆讥伊轻条衔午拧铭胞摊饿苇张密勉级徘责扁肚灾鸦镶曙檀郊哲衅绘
You decide that a first order of bu