文档介绍:REV. 3/03 Weekly Report of Inspection of Water Based Fire Protection Systems ALL QUESTIONS FOR TYPE OF SYSTEM BEING INSPECTED TO BE ANSWERED This form is being offered to assist in the performance and recording of the results of Weekly Scheduled Inspection Tasks of the various types of Fire Sprinkler Systems ponent parts as listed below. Inspecting Firm: Inspection Contract# Name of Inspected Property: Inspector Name: Date: General Items Dry Pipe Sprinkler Systems Y N/A N System (air) pressure gauge psi Control valves sealed in normal open Quick opening device gauge psi or closed position Supply (water) pressure gauge psi Control valves accessible Control valves provided with appropriate Gauge pressor psi wrenches Y N/A N Control valves free from external leaks Gauge readings are normal Control valve identification signs in place System control valve sign indicates area served Backflow prevention assembly valves are Heater operational & room at least 40°F in open position System in service on inspection Reduced pressure assembly not in continuous discharge ALARM PANEL CLEAR : : Preaction and Deluge Systems System (air) pressure gauge psi Supply (water) pressure gauge psi Gauge pressor psi Standpipe and Wet Sprinkler Systems Gauge readings are normal Supply pressure gauge psi System control valve sign indicates area served System pressure gauge psi Heater operational & room at least 40°F Gauge readings are normal System in service on inspection System control valve sign indicates area served ALARM PANEL CLEAR System in service on inspection : ALARM PANEL CLEAR : Water Storage Tanks Water temperature above 40°F (check daily if not electrically supervised) Heating syste