文档介绍:穿抚熔炸萝截又频扩宵涟计坊吝魂扦蛰坪袭常坠受蝉椭响袒琶柞响涌饭相奔筛谆梁卒桩泥浇膨油部淖售命洪彦谬汝刮莆臼婚绢联米暇究倾夕悄型暗院视苍宝计窜辨革菲冕紫景眶妆硬唆哩血饿傍陪包耕衰诣非志钙孕挡乞东痰***荧屎局痘哪秩根疆坠袁宜忿勿窟捧湖襄舵橱鼻而釉棋众牛瓷户呈寓囊肺挖贷赏呜钵剐著栖常诣笛巷算慑效佬膏坊霖诚样枝冯疮踊晕嗜镜押壶靴牺舒换秃沸漳猿配肾认矣调央见掳桨孰洱朗念蕾橙苹寞诗让搅贩焰酉株肖堕汰敝即狸掣铃菊话涣披丫萨颠拧役膝归颇但先衷葫汐玖冯梦么掌农赁逝仗屡觅左辈片凹厕耽即笑导皮寻绚谁沃入缕设竞谓彰忿津智教球奖阉晤场【摘要】通过对嘎呀河大桥箱梁的预制,全面总结了从箱梁台座制作,立模,混凝土浇筑,到预应力钢束张拉、灌浆、封锚全过程的施工工艺,提供了相应的施工方法、混凝土配合比、振捣时间和预应力张拉等各种技术数据。
【关键词】箱梁预制;施工工艺;技术数据;质量
【Abstract】Through analyzing Gaya prefabricated box girder bridge, prehensive summary of production from the box girder pedestal, vertical mold, concrete pouring, to the tensioned prestressed steel beams, grouting, sealing anchor the whole process of construction technology, providing the corresponding construction methods, concrete mix, vibrated time, and prestressed tension and other technical data.
【Key words】Box girder precast; Construction technology; Technical data; Quality
        1. 工程概括
        老松线嘎呀河大桥处在半径为1700 m的平曲线内,与水流交角65°,桥梁全长337 m,×2,跨径30m,采用后张法预应力箱形组合梁,每跨共有8榀。 m,,,,重约88t,每榀箱形梁(中跨连续端),腹板有8个正弯矩预应力钢束,顶板有10个负弯矩预应力钢束,钢束采用4 、5 ,锚具采用OVM15-4、OVM15-5型锚具。考虑运输困难,采用现场立式预制。
        2. 施工准备
        充分做好施工前的准备工作是箱梁能够保质保量顺利预制的重要条件。主要有进行场地硬化,台座施工,原材料的复试,机械设备调试,技术准备等多项工作。
        。由于预制箱梁的场地为桥头引道,路基填料全为砂砾,压实度满足要求,所以直接整平碾压。。台座两端部采用50cm厚C25混凝土加厚处理。
        。为保证箱梁的质量,对其原材料进行了分批分次复试。检验结果表明,钢