文档介绍:目录建立地表观测站的目的·····················2建立地表观测站的目的·····················2三、工作面地质采矿条件··························································································2四、地表移动观测站的设计······················ 观测站设计原则 ···································、位置的确定···························、测点编号·························、观测点的构造及埋设方法设计 ················7五、观测站成果整理方法························10六、移动和变形计算····························10七、绘图工作 ·································12八、观测成果整理 ·····························12九、观测站经费估算····························12一、建立地表观测站的目的某矿6200工作面西部、西南部有后鲍店村、中鲍店村。为研究地下开采对村庄的影响及地表移动变形规律和参数,拟在该矿6200工作面设置地表移动观测站,进行地表移动观测,通过观测获得地表移动动态参数和角值参数,同时,监测地下开采对建筑物的影响。二、建立地表观测站的目的1、由于国内外对重复采动下的地表移动变形及对外建筑物的影响和破坏的研究还很不充分,所以本项目通过地表移动的观测研究,探寻重复采动条件下地表移动变形的规律,对本矿区重复开采沉陷问题起到现实的指导意义。2、综合分析观测资料,求取地表变形的角量参数及概率积分法预计参数。3、用实测的移动变形参数进行建筑物、铁路和水体下的保护煤柱设计,有效地减少铁路、建筑物、水体下压煤量,并可以合理确定综采工作面的尺寸,提高煤炭采出率。4、减少和避免不必要的采矿纠纷,可进行提前预测和防护措施,有利于保护人身、财产安全。三、,是该采区设计开采2层煤的第一个工作面,北部、东部分别为3煤的一采区1308、1310、1312采空区和二采区2310、2311、2312采空区及未开采区域,南部、西部尚未开采。6200工作面基本沿走向布置,为刀把型,走向长为623~820m,倾斜宽为46~129m,~,,煤层倾角4~19/6°,。工作面标高为-233~-303m。2煤与下伏3煤的层间距一般为21m。6200工作面上方地表地势平坦,标高为43m左右,。,求得本区域实测地表移动参数为:走向移动角δ=750,上山移动角γ=750,下山移动角β=750-,表土移动角φ=450,充分采动角ψ1=ψ2=ψ3=550,最下沉角θ=900-、 观测站设计原则 为了能够获得准确、可靠、有代表性的观测资料,在观测站设计中,应遵循以下原则: (1)观测线应设在地表移动盆地的主断面上;(2)观测线在观测期间不受邻近开采的影响; (3)观测线的长度要大于地表移动盆地的范围; (4)根据开采深度和设站目的,观测线上的测点应有一定的密度; (5)观测站的控制点要设在移动盆地范围以外,埋设要牢固。在冻土地区,。、位置的确定观测站共设三条观测线理论图如4-1,其中走向两条(E线和F线),倾向有一条(G线)4-:H0=(H1+H2)/2=311mD≥=*311=°,所以倾斜观测线应从采空区中间穿过采区。观测线长度的确定观测长度因为受到东北部采区影响,无法用公式计算,则用CAD来直接量取长度。倾斜观测线长度:G=:E==、测点编号工作测点的外端点至控制点的距离及控制点间的距离为50~100m,根据情况设置为80m。由书中表6-2可知,开采深度平均为311m,所以,观测点距离为25m,根据量算三条观测线的实际长度即每条线上的控制点数目、测点数目、测点间距如下表:观测线总长