1 / 18
文档名称:

NPI流程.pdf

格式:pdf   页数:18页
下载后只包含 1 个 PDF 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

NPI流程.pdf

上传人:燕赵才子 2011/7/18 文件大小:0 KB

下载得到文件列表

NPI流程.pdf

文档介绍

文档介绍:Supply Chain NPI Process A8

Co., Ltd.


SOP502ENG














Supply Chain NPI Process

(System product)







Proprietary
Not for use or disclosure outside , Inc. or any of its subsidiaries except under prior written agreement.
Intended Audience: Managers, Quality Assurance Group & Internal Auditors.
This document is controlled electronically and any hard copy should be considered uncontrolled except DCC stamped
Supply Chain NPI Process (A8 2/18)


Revision History

Version # Author Description of Change Revised Date

A0 金燕娟 New created process 2001/7/4
A1 柳云涛 Enhance process 2002/1/22
A2 岳熙峥 Adding attachments , 2003/9/28
optimize the process
A3 Charlie Qin Convert to English version; 2005-5-22
Link the NPI process to PRP;
Well define the
responsibilities of different
teams during the NPI phase;
Add “Factory MP
Application Form” into the
process.
A4 侯加树 2006-7-12
Update the Factory
Production Application Form
(on page 11, Templates item).
A5 杨超振 Add 5 controlled documents 2007-4-29
template
A6 朱景 Add 2 controlled documents 2007-12-21
Prototype Run Report and
(Pre)pilot run Report Form
()
A7 朱景 update based on new PRP and 2008-8-8
correct some issue
A8 刘朝华/胡国兴 Update based on project “NPI 2008-11-21
Express way”
Proprietary
Not for use or disclosure outside , Inc. or any of its subsidiaries except under prior written agreement.
Intended Audience: Managers, Quality Assurance Group & Internal Auditors.
This document is controlled electronically and any hard copy should be considered uncontrolled except DCC stamped
Supply Chain NPI Process (A8 3 / 18)
1 Description
The purpose of this document is to define the process used for essful introducing
new product designs into production throughout . This process is typically
initiated by PRP Gate 1, includes ESI, and t