文档介绍:NPI Checklist
Product:
Part No.:
Customer:
plete Resp. Date pletion
Production NPI Checklist Line Yes No Yes No Target Actual Detail
Receive Information Bom(s) From Customer 1
AVL From Customer 2
Type ponents package 3
Will material be Consigned ? 4
List of Consigned material ( Date, P/N, Description, QTY, etc.) 5
Supply Agreement in place/Customs Contract 6
PO in place 7
Gerber 8
CAD Files 9
Fabrication Drawing 10
Assembly Drawings for PCBA 11
Mechanical drawings for box build parts 12
Box building procedure / instructions 13
Electrical Schematics 14
Functional Test Specs. 15
Component Spec's/Drg's 16
ECN History & copies of ECN's in progress 17
Customer supplied Inspection Standards 18
Customer supplied Cosmetic Standards 19
Will product ship with User Documents 20
Depanelization configuration (brds per panel) 21
PCB Panel drawing 22
3 Bare PCBs or Panels for process, test development 23
Artwork for PCB panel 24
3 Assembled "Gold" Boards 25
3 Assembled box building 26
List of ponents / parts 27
List of humidity ponents 28
List of temperature ponents 29
Customer ponent programs 30
Customer ponent Master devices 31
Final Pack drawing (Bags, Tray, Carton, Pallet, Packing, etc) 32
Labelling requirements (PCBA / Box-build) 33
Method of Shipment 34
Proto build required? 35
Will Customer be on-site to witness build 36
Product handling requirements, if any. 37
Box build process engineering requirements 38
Box build MPIs 39
Box build test engineering requirements 40
Special rework requirements, if any. 41
NPI Milestone / Gantt Chart ( Proto / Pilot / Engineering Build) 42
Quote Review: Material 43
Labor 44
Test 45
NRE Cost 46
Quotation for Rework 47
Submit Prototype Quote 48
Bom(s) on System Item Masters on system 49
ponent desc. checked plete 50
Material format (tape/reel) 51
ECN Level 52
Prod