1 / 28
文档名称:

外墙岩棉板保温施工方案95163模板.doc

格式:doc   大小:933KB   页数:28页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

外墙岩棉板保温施工方案95163模板.doc

上传人:读书百遍 2019/12/29 文件大小:933 KB

下载得到文件列表

外墙岩棉板保温施工方案95163模板.doc

相关文档

文档介绍

文档介绍:外墙岩棉板保温施工方案95163外墙外保温施工技术方案目录第一章编制依据·······································6第二章工程概况·······································6第三章施工部署·······································7第一节施工组织管理机构·······································7第二节施工管理构架图·········································7第三节施工部署···············································8第四章施工管理措施···································9第一节工期保证措施···········································9第二节质量保证措施··········································10第三节安全保证措施··········································10第四节文明施工保证措施······································11第五章施工工艺······································12第一节施工条件··············································12第二节施工工具··············································12第三节系统构造和材料性能····································12第四节施工工艺流程··········································16第五节保温施工··············································17第六章施工验收·····································21第七章成品保护·····································24第八章各类安全事故的抢险措施·······················24第一节触电事故的抢险措施···································24第二节高空坠落触电事故的抢险措施··························25第三节机械伤害事故的抢险措施······························26第四节火灾事故的抢险措施··································26第五节消防措施············································27第十章冬季和雨季施工措施··························27第一章编制依据(1)本工程外墙外保温设计说明及设计变更文件(2)《建设节能工程施工质量验收规范》GB50411—2007(3)《建筑工程施工质量验收统一标准》GB50300—2013(4)《公共建筑节能设计标准》GB50189—2015(5)《夏冬热冷地区居住建筑节能设计标准》JGJ134-2010(6)《安徽省公共建筑节能设计标准》DB34/1467-2011(7)《安徽省居住建筑节能设计标准》DB34/1466-2011(8)《岩棉板外墙外保温系统应用技术导则》DBHJ/T002-2011(9)《岩棉板外墙外保温系统应用技术规程》DB34/T1859-2013(10)《建筑幕墙》GB/T21086-2007第二章工程概况1、工程名称:2、建设单位:3、设计单位:监理单位:5、施工单位:6、保温类型:本项目采用涂料饰面岩棉板保温系统且岩棉板密度≥160Kg/m³,外墙保温厚度30mm。7、工期目标:总工期以合同要求(具体以施工进度计划为准)8、质量目标:合格第三章施工部署第一节施工组织管理机构一、项目经理负责制成立以项目经理为首的工地办公室,集中办公,按工作职责进行分工管理,由项目经理统一指挥。项目经理以下配备项目技术负责人、材料员、安全员、质检员、施工员。二、管理人员职责(1)项目经理:代表企业法人,全面负责工程的统筹、安排和决策。(2)项目技术负责人:协助项目经理协调各部门与施工班组的关系;协调与总包、监理、主管部门及其它有关职能部门的关系,及时解决遇到的各种问题,负责对本工程中的人、财、物进行调度指挥。根据施工图纸和本工程的要求,布署施工员、质检员等下