1 / 44
文档名称:

强条管理实施细则(5变电气施工).doc

格式:doc   大小:597KB   页数:44页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

强条管理实施细则(5变电气施工).doc

上传人:1314042**** 2020/9/22 文件大小:597 KB

下载得到文件列表

强条管理实施细则(5变电气施工).doc

相关文档

文档介绍

文档介绍:Q/GDW国家电网公司企业标准Q/GDW2485—2008输变电工程建设标准强制性条文实施管理规程第5部分:变电站电气工程施工2009-06-30发布2009-06-30实施国家电网公司发布前言根据国家电网公司国家电网科[2008]928号《关于下达国家电网公司2008年度标准制修订计划(第一批)的通知》,制定本规程。本规程贯彻“强制性条文、强制性执行”的指导思想。《输变电工程建设质量强制性条文实施管理规程》是一套系列标准,用于输变电工程建设中强制性条文的执行、检查及记录。该规程由如下8部分组成:——第1部分:通则——第2部分:变电站建筑工程设计——第3部分:变电站建筑工程施工——第4部分:变电站电气工程设计——第5部分:变电站电气工程施工——第6部分:输电线路工程设计——第7部分:输电线路工程施工——第8部分:输变电工程施工安全本部分是该规程中的第5部分:变电站电气工程施工。对变电站电气工程施工质量强制性条文参建各责任主体单位的执行、检查及记录做了统一规定,尽可能地避免在执行中发生偏差、遗漏和违反强制性条文的情况,有利于变电站电气工程施工水平及工程实体质量的提高。本规程由国家电网公司基建部提出。本规程由国家电网公司科技部归口。本规程由国家电网公司基建部负责解释。本部分主编单位:山西省电力建设工程质量监督中心站本部分参编单位:山西锦通工程项目管理咨询有限公司、山西省电力公司忻州供电分公司本部分主要起草人:高士法、丁瑞明、郝志刚、王巳英、毛志文、李源、浮习新、石志伟、李灵川、张雷、白彦杰、王锐锋、陈强、薛茜、李怀斌、周利柱、范、陈建光目次前言·············································································································································21范围·········································································································································52规范性引用文件·······················································································································53强制性条文执行计划表·········································································································54高压电气设备···························································································································1241断路器··································································································································1242变压器··································································································································1243母线········································································································································135电缆线路施工···························································································································146接地装置施工······································································································