文档介绍:GCI TECH NOTES©
GCI 的工艺摘要
Volume 11, Number 11 A Gossman Consulting, Inc. Publication November 2006
This is part of a series of GCI Tech Notes focus- 这是一系列专业摘要中的一部分 GCI ,关注于
ing on the early development of the hazardous 上世纪 80 年代早期发展利用危险废物燃料的过
waste fuels programs during the early 1980s. I 本人于程。 80 年代初被聘为项目经理,为一
was hired as the facility manager for the first 家水泥厂建立[美国]第一个作商业用途的、危
commercial hazardous waste operation at a ce-
险废物燃料的处理设施。许多有关储存、加工、
ment plant in early 1980. Many of the develop-
ments in storage, processing, testing and use of 测捡和使用危险废物燃料[措施]的发展是于 80
hazardous waste fuels were the result of work 年代早期和中期,在为数不多的几家[水泥]厂
done at a handful of plants in the early and mid 子里实践中得出的结果。回顾一些遇到的问题;
80’s. Look for issues to include topics on storage, 包括储存、化验室测试的方法、操作过程等,
lab testing methods, processing and the impact of 以及危险废物燃料对水泥产品的品质和生产方
HWF on cement product quality and production. 面的影响。
当初危险废物燃料使用于水泥窑的经济与竞争
Economics petition for Hazardous Waste Fuel in
Cement Kilns – The Early Years
By David Gossman, Gossman Consulting, Inc.
In early 1980 the temporary facility set up by 1980 年初[公司名 Systech 于聘用我之后不]
Systech at General Portland Cement in Paulding,
久,设在俄亥俄州,保尔定地方的通用水泥厂
Ohio began routine operation shortly after I was
hired. I began the process of equipping and start- 内的临时设施就开始正常地运作起来我开始。
ing up an onsite testing lab, staffi