1 / 17
文档名称:

ProjectRiskAssessment项目风险评估英文版.docx

格式:docx   大小:210KB   页数:17页
下载后只包含 1 个 DOCX 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

ProjectRiskAssessment项目风险评估英文版.docx

上传人:xiarencrh 2020/12/17 文件大小:210 KB

下载得到文件列表

ProjectRiskAssessment项目风险评估英文版.docx

相关文档

文档介绍

文档介绍:XXXXXX Project
HSEC Risk Assessment Document
Prepared By:
Checked By:
Approved By:
Name
Signature
Date
Version History
Version
Description of Changes
Date
0
Issued for Submission
2012-01-12
 Version History
Contents
Section 1 -ﻩIntroductionﻩ4
Section 2 -ﻩPurpose 4
Section 3 -ﻩScope 4
Section 4 -ﻩHigh Level Findingﻩ4
Section 5 -ﻩDefinitionsﻩ5
Section 6 - Assumptionsﻩ5
Basic project details 6
Assessment assumptions 6
Section 7 - Processﻩ7

Introduction
This Execution Risk Assessment document provides the construction team with a detailed assessment of potential risks/hazards associated with the construction work to be performed during the course of the XXXXXX Project (SRWCP).
It is a living document and shall be regularly updated as new risks/hazards are determined and mitigation factors resolved.
The content of the Execution Risk Assessment shall be employed in the development of site-specific risk control measures, which shall be formally utilized in the field to ensure that all work is undertaken in the safest manner possible.
Purpose
The following has been developed to outline the identified Risks strategy within the various phases of the SRWCP.
The overall purpose of the document is to outline risks or threats to which the organisation, project and personnel are exposed. This includes, but is not limited to the design and execution phases of the Project.
When assessing the risks to the organization the following impact or consequences shall be considered:
The risks to the health and safety of employees to which they are exposed whilst at work;
The risks to others not in his employment and those potentially affected by his acts and omissions;
Subsequent risks to the environment.
Subsequent loss to the organization.
Scope
The scope of the Risk Manageme