文档介绍:Manual for installation of base plate for actuator (for reference to customer)
Base plate for actuator as assembled
4pc of jack bolt is attached to side (MHI scope)
Concrete casting until FL-1970
Direction of base plate shall be matched on building reference line. Top plate of base plate has center marking line. Customer shall install base plate within ±1mm (target)
Marking on proper position. Drilling for jack up bolt. Fix jack up bolt by mortar or chemical anchor.
Londitudinal and lateral 8pc of turn-buckle shall be set
Adjust FT-270 by using jack up bolt and turn-buckles. Center marking also adjusted. Customer adjust position±1mm.(MHI will check at site)
Base plate fixed by (A)8pc and (B)4pc. (A) and (B) shall be welded on reinforcing bar.
Detail of supporting mold steel
Frame of base plate shall be fixed on overhanging reinforcing bar. Using supporting mold. (Customer shall make ready this overhanging of reinforcing bar on the bottom of base plate )
Bolt head parts shall be protected by masking
Reinforcing steel bar shall be placed between bar on basement and base plate.
Concrete casting until FL-470.
Remove upper plate and make the back side clean (MHI scope)
Upper plate setting on building reference line (☆). Center marking and leveling(☆☆☆). Positioning of firing direction shall be done (☆☆).(Nut adjusting on and below top plate ) (MHI scope)
Center line of upper plate shall be extended and piston center A is decided .This line is used as center line of crash simulator.
Around concrete casting shall be done .(FLO~FL-470)
Grout (non-shrink mortar ) injected on the back side of upper plate .(FL-270~FL-470)
Manual for installation of rail base plate (for reference to customer)
⒈Purpose
This document makes clear how to measure rail and rail base plate positioning.
2. Used gauge
Transit compass, Auto-leveler, Square gau