文档介绍:EPC工程总承包合同实施细则 (中英文)
DETAILED RULES OF EXECUTION OF EPC
Table of Content目录
INTRODUCTION简介
HEALTH & SAFETY 健康与安全
LEED OBLIGATIONSLEED责任
TESTING & MISSIONING测试与调试
PROGRAMME AND REPORTS进度计划与报告
OVERALL CO-ORDINATION RESPONSIBILITIES 全面协调职责
SITE AND INSPECTION现场与检查
PLETION DATE/ POSSESSION AND PLETION完工日/接管与完工
GENERAL SITE MANAGEMENT OBLIGATIONS整体现场管理要求
TEMPORARY WORKS临时设施
STATUTORY OBLIGATIONS法定责任
SHOP DRAWINGS AND SPECIFICATION深化加工图与说明
MATERIALS AND WORKMANSHIP材料与工艺
PROTECTION OF PUBLIC PROPERTY, ETC公共财产保护等
ARTIST OF TRADESMEN NOT SUB-CONTRACTORS非分包商的艺术家和工匠
INSTRUCTIONS, VARIATIONS AND METHODS OF MEASURING AND VALUING
指令,变更和测量与评估方式
Appendix
Appendix A–LEED-NC Green building Certification Construction Requirement dated 18th January 2008 (refer to the file included in the Construction Design Pack of the Tender Document)
附件 A – LEEDTM绿色建筑认证施工要求指南,2008年1月18日版(请参阅招标文件中的成套施工图设计文件)(译注:美国LEED体系是一个国际性绿色建筑认证系统。)
Appendix B–Testing and mission Specification (refer to the Construction Design Pack of the tender document and it may be updated in Part II of the Tender Document)
附件 B – 调试和测试说明(请参阅招标文件中的成套施工图设计文件,这个文件可能在第二部分招标文件中修正。)
Appendix C–Sample Schedules (refer to the Construction Design Pack of the tender document and it will be updated in Part II of the Tender Document)
附件C – 样品计划(请参阅招标文件中的成套施工图设计文件,这个文件可能在第二部分招标文件中修正。)
Appendix D–Soils Report
附件 D –岩土工程勘察报告
Appendix E–EI Report version
附件 E –环境研究报告第二版
Appendix F–Design and Build Suggestions resulting from the Global Ltd’s Phase I and Phase II Environmental Investigations of the site dated
附件 F – 根据环境工程()针对场地现场的第一阶段和第二阶段环境研究的成果的发布于的对设计和建设的建议方案
INTRODUCTION简介
IMPORTANT NOTE: All provisions included within these Preambles are obligatory upon the General Contractor and should be read in conjunction with all Contract Documents. In the event of any conflict between contract documents, the GC should rai