文档介绍:ELECTRIC POWER ICT................................................................
method of MV lines of distribution network considering load Automation of Electric Power Systems,2018,42(24):20-26(in
forecasting error uncertainty[J].Power System Technology, Chinese).
2018,42(6):1907-1916(in Chinese). [25] 蔺呈倩,王洪涛,赵瑾,等.基于可信性理论的含直流落点系统
[22] 徐箭,曹慧秋,唐程辉,等.基于扩展序列运算的含不确定性需 风电与负荷协调恢复优化[J].电网技术,2019,43(2):410-416.
求响应电力系统优化调度[J].电力系统自动化,2018,42(13): LIN Chengqian,WANG Hongtao,ZHAO Jin,et al.Wind
152-160. Power-load coordinated restoration optimization of power system
XU Jian,CAO Huiqiu,TANG Chenghui,et al.Optimal dispatch with DC terminal location based on credibility theory[J].Power
of power system considering uncertainty of demand response System Technology,2019,43(2):410-416(in Chinese).
based on extended sequence operation[J].Automation of Electric 编辑 刘雪莹
Power Systems,2018,42(13):152-160(in Chinese). 收稿日期:2020-02-25
[23] 孟繁星,孙英云,蒲天骄,等.考虑区域自治能力的主动配电网
分层优化调度[J].电力系统自动化,2018,42(15):70-76.