文档介绍:Question 1
Construction and demolition debris includes all but which of the following?
A Concrete from a demolished building
C B Steel from a demolished building
C C Drywall
(T)D Rocks
Notes:
Reference: O&M Glossary
Construct! on mnd demolition (C&D) debris is defi ned as: 'Waste and recyclables gen erated from construction, renovation, and demolition or deconstruct!on of preexisting structures.'
Rocks would be part of the excavation of the site area.
The steel and concrete are all debris that came from the existing building.
Dry wall can come from an existing building or as scraps from new construction.
Hazardous materials, excavated soil (rocks) and Iand-clearing debris do not contribute to LEED credits but these items should still be addressed in a construction waste management plan.
Question 2
What should be included in a construction waste management plan?
Asbestos removal ©B Where construction debris will be diverted r C Erosion control
C D The percent of recycled materials
Notes:
The plan should in elude the goals of the team as well as what will be diverted, where to, and by whom.
Hazardous waste is not included and must be disposed of based on local codes.
Question 3 Show Answer Lege nd
®A
A project team discovers a new way to avoid the heat island effec仁 How does the LEED certification process reward this new concept?
Heat Island Effect is covered by LEED, so no additional points would be given
「 B An innovative performance point would be awarded
「C An exemplary performanee point would be awarded
「 D An extra Heat Island Effect point would be awarded
Notes:
Irmovative performance as part of the Irmovation in Design or Operations category is meant for green building categories not specifically addressed by LEED.
Irmovation credits are not awarded for the use of a particular product or design strategy if the technology aids in the achievement of an existing LEED credit.
USGBC/GBCI uses the Cl R process for cases like this. A C