1 / 4
文档名称:

2010全国生物材料大会论文集之 (906).pdf

格式:pdf   页数:4
下载后只包含 1 个 PDF 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

2010全国生物材料大会论文集之 (906).pdf

上传人:一文千金 2011/12/24 文件大小:0 KB

下载得到文件列表

2010全国生物材料大会论文集之 (906).pdf

文档介绍

文档介绍:Study on Environmental-geological Problem and
Ecosystem Re-establishment Countermeasures
about Quarry and Damaged Mountain in Peri-urban

Y. G. XUE D. B. TENG
Geotechnical & Structural Engineering Research Center College of Construction Engineering
Shandong University Jinlin University
Jinan, China Changchun, China
******@sdu. sddebin@
S. C. LI M. X. SU
Geotechnical & Structural Engineering Research Center Geotechnical & Structural Engineering Research Center
Shandong University Shandong University
Jinan, China Jinan, China
******@sdu. ******@sdu.


Abstract—The quarry and damaged mountain in peri-urban have cutting not only destroy physiognomy and geologic
an important influence to ecological environment. They have had a environment but also create huge visual and environment
series of serious environmental-geological problems to the socio- pollution, at the same it reduce the supply from the
economic development and urban modernization process, such as atmospheric precipitation to underground water. The high
increased environmental pollution and soil erosion, destruction of and steep side slope formed after the disrepair of the
landscape aesthetic, induced geological disasters, and had an mountain massif also can be induced by geologic hazard,
impact on groundwater seepage and so on. So it has an important such as col