several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
联营工程管理办法
为了规范联营管理工作,维护企业利益,特制订本办法。
一、公司对联营工程管理的相关文件是各公司所属联营工程的管理依据,各分公司必须按规定程序严格执行。具体文件见“山西建筑工程(集团)总公司联营管理办法”(晋建总承市发[2007]24号)、“关于进一步规范集团联营工作的补充意见”(2008年1月28日)以及“关于联营管理的有关规定”(2008年2月27日)。
二、管理权限规定:合同价款低于1000万元(包括1000万元)的建筑工程禁止联营;合同价款为1000万元--2000万元(包括2000万元)的联营工程必须严格控制,且报公司审核批准;合同价款大于2000万元的联营工程,按规定办理手续,报公司审核批准。
三、联营项目上交公司管理费采取确保最低费用、分段累计计算的方法:1000万元(含)以下为30万元;超过1000万元至2000万元(含)%;超