文档介绍:ABSTRACT This thesis is a research on a Improvement based on the theory ofLean Production forimproving production efficiency method of system analysis thatqualitative analysis integrated with quantitative analysis was adopted,and the theories and methods of industrial engineering and Lean Manufacturing taking factorylayout asexample,it was dissertated systematically ofcontinuous improvement process activity,by which the layout inproduction cell logistics,process flow,production line balance,the strategy of self-manufacturing and out—manufacturing of the products etc was analyzed and optimized,.Thereafter,many wasters and added works were eliminated,WIP andmanufacturing cycle timewere production model of one—piece-flow themodel ofKanban Production,the production model ofpush Was changed totheproduction model ofpull,which enhanced productive efficiency roundly,reduced cost and reinforced petitive power ,the thought ofleanproduction bined withtheprinciples ofworld-class factory theapplication of brainstorm,the current layout,material flow,production process was analyzed, whereafter thebottleneck ofinfluenced efficiency Was discovered,and put forward theexecution oftheproposals,achieving thetarget ofimproving efficiency anddecreasing cost. KEY WORDS:Lean Production,Layout Improvement,Industrial Engineering, Efficiency,One-piece-flow,KanbanManagement 独创性声明本人声明所呈交的学位论文是本人在导师指导下进行的研究工作和取得的研究成果,除了文中特别加以标注和致谢之处外,论文中不包含其他人已经发表或撰写过的研究成果,也不包含为获得丞洼太堂或其他教育机构的学位或证书而使用过的材料。与我一同工作的同志对本研究所做的任何贡献均已在论文·+I 作了明确的说明并表示了谢意。学位论文作者签名:讥签字同期:a一7年d_∥l_1 、使用学位论文的规定。特授权丞注太堂可以将学位论文的全部或部分内容编入有关数据库进行检索,并采用影印、缩印或扫描等复制手段保存、汇编以供查阅和借阅。同意学校向国家有关部门或机构送交论文的复印件和磁盘。(保密的学位论文在解密后适用本授权说明) 学位论文作者签名:<莎包导师签名: 签字日期:Jp7年s月据同签字R期;锄嗲年F月话f{ 第一章问题提出第一章问题提出现代经济的迅速发展,市场需求越来越多样化,已经发展到了多元化、个性化时代,市场也从卖方市场向买方市场转变,开放的市场企业使感到前所未有的竞争压力,对各国企业来讲,这是一场全球范围内的生存竞争,而竞争的规则是优胜劣汰