文档介绍:several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured8
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured9
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
XX市机械施工集团XX
设备采购管理办法
一、总则
1、编制依据及目的
为进一步规范机施集团设备采购管理,降低施工成本,控制风险,促进经济效益提升,依照建工集团《设备管理指引》、《加强和完善分包商和设备材料采购管理的补充规定》及机施集团《设备管理规范》中的有关规定,特制订本办法。
2、适用范围
本办法中的设备是指机施集团出资的机械设备,包括试验设备及仪器、施工机械、运输设备(含非生产车辆)及生产设备。
总包工程中为业主代采购机电设备的采购管理可参照本办法执行。
3、管理原则
(1)分级分类原则
机施集团设备采购实施统一领导,分级分类管理,集团本部及各工程公司建立相应的设备管理部门和管理体系,并根据公司内部层级,设置相应的设备管理岗位和管理人员。
(2)事先报告、审批原则
所有机施集团出资的设备采购前,必须提交设备添置或更新专项请示报告,按建工集团及机施集团有关规定,经建工集团、机施集团批