文档介绍:Strategies for Decentralized Production Planning:
parative Case Study
Kryssanov ., Tamaki H., Kozasa J., and Kitamura S.
Faculty of Engineering, Kobe University, Rokkodai, Nada, Kobe 657-8501, Japan
E-mail: ******@-, fax: (+81) 078-803-6102
which frequently emerge in a global production
Abstract environment, are still relatively unexplored. An
This paper discusses strategies of analysis of the literature reveals that an overwhelming
decision-making in production planning and majority of works on this subject were dedicated to
scheduling for a distributed manufacturing the development of putational methods
system. A production system consisting of a (. GA-based) aimed at obtaining effective
number of workshops is considered, and four schedules for plex production task executed in
general schemes of interaction and co-operation by a few anizations with
information exchange between agents relatively independent manufacturing facilities (. [1]
involved pleting an overall production and [2]; also see [3] for a general discussion). Very
plan with a schedule for the system are little has been done, however, to systematize those
described. A GA-based software tool is methods into methodologies of wide-range application
developed to generate a schedule for and, then, pare their effectiveness. The
di