1 / 7
文档名称:

长安福特.doc

格式:doc   页数:7
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

长安福特.doc

上传人:Hkatfwsx 2014/9/15 文件大小:0 KB

下载得到文件列表

长安福特.doc

文档介绍

文档介绍:长安福特
Initial position A
Operated B
Fluid pump pressure 1
Drain hole to fluid sump 2
Main line pressure 3
Throttle pressure 4
Preload pressure 5
Initial position A
Operated B
Main line pressure 1
Preload pressure 2
Drain hole to fluid sump 3
Initial position A
Operated B
Preload pressure 1
Throttle pressure 2
Drain hole to fluid sump 3
Main regulating pressure 4
Initial position A
Operated B
Main line pressure 1
Accumulator control pressure A 2
Main regulating pressure 3
Drain hole to fluid sump 4
Initial position A
Operated B
Main line pressure 1
Accumulator control pressure B 2
Control pressure of the PWM solenoid valve forthe 2nd/4th/5th gear brake3
Drain hole to fluid sump 4
Initial position A
Operated B
Main line pressure 1
Accumulator control pressure C 2
Control pressure of the PWM solenoid valve for
the 3rd - 5th gear clutch
3
Drain hole to fluid sump 4
Initial position A
Operated B
Main line pressure 1
Converter pressure 2
Drain hole to fluid sump 3
Initial position A
Operated B
Main line pressure 1
Reduced actuation pressure, 1st - 3rd gear clutch 2
Main regulating pressure 3
Drain hole to fluid sump 4
Initial position A
Operated B
Main line pressure 1
Reduction brake band pressure 2
Accumulator control pressure B 3
Drain hole to fluid sump 4
Initial position A
Operated B
Main line pressure 1
Drain hole to flui