文档介绍:编号:
仓库租赁协议模板英文
甲 方
乙 方
签订日期 年 ptance method 1. Party B shall provide Party A with necessary data for inspection of the goods,
if fails to provide necessary data for inspection of the goods or provide information is not complete, not timely and this results acceptance mistakes and delay or the occurrence of conformity type, quantity or quality of the goods does not conform to the contract, Party A shall not assume liability to pay compensation.
2. Party A shall, in accordance with the provisions of the contract goods packaging appearance, quantity and quality, variety, an acceptance of inbound, if found not in conformity with the contract, it shall promptly notify Party B. If Party A acceptance the project not according to stipulations, methods and deadline or acceptance inaccurate and the actual economic losses caused by this ,Party A is responsible for all these losses .
3. Acceptance deadline for _____ days (not exceed 10 days) Party A is responsible for the loss caused by extend the acceptance time limitation .
Article Sixth : inbound and outbound procedures:In accordance with the relevant stipulations of the inbound, outbound regulation, (if not dealt with, according to mutual agreement) When inbound and outbound , both parties's representative or agent should be present, and sign the records of after testing by both representative or agent. This record as the integral part of the contract, the parties each save a copy.
Article Seventh Loss standards and depletion dealing:According to relevant regulations about loss standards and depletion dealing (if there is no regulation dealt with mutual agreement)
Article Eighths Responsibility of breach 一、Party A's responsibility:
1. Due to Party A's responsibility, cause retreat warehouse or not inbound , Party A shall pay the freight and compensation to Party B by the contract's regulati