文档介绍:TECHNICAL ANNEX
FOR
EPC CONTRACT
OF
TISCO SECOND STAGE EXPANSION PROJECT VIETNAM
TISCO二期扩建工程项目总承包(EPC)合同
技术附件
TECHNICAL ANNEX (VIII)
(GENERAL LAYOUT AND TRANSPORTATION, ROADS, RAILWAYS, ALL KINDS OF WORK FOR TISCO’S SECOND STAGE REVANPING AND EXPANSION PROJECT)
TISCO二期扩建工程之总图运输,公路,铁路,各种管网
CONTENTS INDEX
附件目录
GENERAL DISCRIPTION OF TISCO’S STAGE II EXPANSION PROJECT( EPC)
TISCO二期扩建工程概述
WORKING SCOPE OF CONTRACTOR
承包商工作范围
ADOPTED STANDARDS AND CODES FOR THE PROJECT
项目规范和标准
DESCRIPTION OF GENERAL LAYOUT, TRANSPORTATION, ROADWAY, RAILWAY AND PIPELINE WORKS OF THE WHOLE PLAN (STAGE II)
全厂TISCO二期扩建工程之总图运输,公路,铁路,各种管网的概述
5. EQUIPMENT LIST AND GENERAL LAYOUT ARRANGEMENT
设备清单与布置图
6. SOLUTIONS FOR IMPLEMENTATION ARRANGEMENT
进度计划
GENERAL DISCRIPTION OF TISCO’S STAGE II EXPANSION PROJECT (EPC)
TISCO二期扩建工程概述
According to the requirements of sold bidding document 01#EPC, dated on March. 10, 2007, for the second stage revamping and expansion project of TISCO, the long process of steel making production line with capacity of 500,000t/a casting billet will be newly built up in the main plant areas of LUU XA.
根据在2007年3月10日卖出的01#EPC—TISO二期扩建项目投标文件的要求,在LUU 。
According to the requirements of bidding document, Fe metal balance for producing 543,200 t/a hot metal is shown as following calculation block diagram:
根据投标文件要求,年产543,200 t铁水中金属铁的比例如计算框图
Purchased
采购磁铁矿
(TFe62%)550,000t/a
Purchased iron concentrate
(TFe53%)
精铁矿
300,000t/a
Lump ore
矿块
(TFe62%)138,700 t/a
Sinter
烧结矿
(TFe55%)
million ton/a
1×550m3BF
million ton/a
Steel-making1×50t converter
million ton/a casting billet
炼刚1×50转炉 5000000ton/a
连铸坯
MAIN TECHNICAL PROCESS FLOW CHART
主要工艺流程
LUU XA main plant will adopt a long process production line, namely coke oven, sintering machine, blast furnace, converter, and continuous casting production line.
LUU XA主厂区采用长流程炼焦、烧结、高炉、转炉连铸生产工艺
01# EPC package mainly include