1 / 47
文档名称:

设备的点检管理.doc

格式:doc   大小:3,253KB   页数:47页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

设备的点检管理.doc

上传人:玉玲珑 2022/2/2 文件大小:3.18 MB

下载得到文件列表

设备的点检管理.doc

相关文档

文档介绍

文档介绍:设备的点检管理
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. P的实质
按预先设定的部位、项目和内容,对设备进行检查和测定,掌握设备劣化的程度和发展趋势,进而提出防范措施并及时加以处理,确保设备性能稳定,延长零部件寿命,达到以最经济的维修费用来完成设备维修的目的。

(1) 体现了设备管理思想的更新。点检管理摆脱了传统管理的被动性,增强了管理意识,也改变了传统、僵化的管理思想,如从以修为主的思想转为以防为主,从只管设备使用维修阶段转为设备一生管理,从只抓设备技术管理转为既抓技术管理又抓经济管理,从以时间为基础的维修转为以技术状态为主的维修等。
(2) 实行全员管理。这是点检工作的基础,是点检制的基本特征。
(3) 专职点检人员按区域分工进行管理。这是点检活动的实体,是点检制的核心。
(4) 管理职能的重心下移,点检员是管理者。这是点检制的精髓,真正体现了点检员的核心地位。
(5) 按照严密的规程标准体系进行管理。点检是一套科学的管理工程,不再是经验型管理或长官意志的盲目指挥,而是由完整的规程标准体系将其沿着科学的轨道推进,这是点检活动的科学依据。
(6) 把传统的静态管理推进到动态管理。点检定修制减少了传统的大、中、小修的盲目性,
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured31
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical error