1 / 7
文档名称:

冷负荷 (6).pdf

格式:pdf   大小:213KB   页数:7页
下载后只包含 1 个 PDF 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

冷负荷 (6).pdf

上传人:q1188830 2022/2/20 文件大小:213 KB

下载得到文件列表

冷负荷 (6).pdf

相关文档

文档介绍

文档介绍:Characterization of Distribution Systems
Overcurrents Using Expert Systems
umptions are made in the design and
overloads or cold load pick-up, and switching events). application of distribution of equipment. Theoretical
Pertinent parameters (frequency of occurrence, magnitude,
2 maximum fault current magnitudes can be calculated using
peak current, rms current, duration, I t and time constant) were the distribution system impedances. The impedance of the
measured or computed.
fault arc itself is seldom known and is accounted for by
Index Terms – Expert Systems, Distribution System, assumptions such as adding an assumed arc impedance.
Overcurrent, Fault, Inrush, Protection There is a need for comparing such calculations with actual
measured data. The statistical variations of current
I. INTRODUCTION magnitudes, durations, and dc offsets are generally unknown.
Very little is known about the harmonic components of most
Overcurrents on distribution systems include permanent overcurrents.
faults, temporary faults and other lower