1 / 100
文档名称:

煤矿开采技术-采矿工程毕业设计.doc

格式:doc   大小:2,407KB   页数:100页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

煤矿开采技术-采矿工程毕业设计.doc

上传人:龙的传人 2022/2/26 文件大小:2.35 MB

下载得到文件列表

煤矿开采技术-采矿工程毕业设计.doc

相关文档

文档介绍

文档介绍:煤矿开采技术-采矿工程毕业设计
煤矿开采技术-采矿工程毕业设计
I / 100
煤矿开采技术-采矿工程毕业设计
5 / 84
煤矿开采技术-采矿工程毕业设计
Abstract
    The design is the exploitation of MaiDiZhang 02,6,8 # coal mine, coal seam thickness was m, , , seam pitch was 60 m, 40m. According to data mine the external investigation of the mine field for the high-gas coal mine, the coal gas emission in an average of / t, the next group of coal to / t. Seam of both the risk of explosion. Grade coal to natural tendency not spontaneous combustion. According to mine discharge forecast, the normal discharge of mine for 1255m3/ d, Chung's largest water at 1600 m3/ d
The Coal Mine in Qingxu county, 10 km NATO, which has Gujiao Qingxu to the same highway. Qingxu county from the Taiyuan city about 40 km, which has the same 307 National Road. Although the mine in more complex terrain, but between the village and village roads are linked to simple, can use trucks. Therefore, the location of Industry Square in the vicinity of Chen Jia Ping, a shaft development, Lord, vice shaft ventilation shaft and the section were m2, m2, m2. Develop a programme for the Chen-ping from the vicinity of the north east is necessary to develop the transport, rail, air return roadway to the north mine the border and then west from Chen Jia Ping pioneering South transport, rail tunnel, and then north tunneling West transport, track , To the wind tunnel. Option 2 is in the south of Chen Jia Ping tunneling transport, rail and air return roadway, and then in mine excavation west of the West transport, rail, air return roadway to the northern border. Option 1, two are located in the industrial plaza near Chen Jia Ping. According to comparison can be regarded as pioneering works of the same, but the technical programme in the reverse transport, and face the direction of advancing too long, equipment requirements, so I chose to develop a programme. Develop a p