文档介绍:电气工程及其自动化专业英语
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate s
教材难点:
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
Exercises:独立完成并上交。
Section 5 Basic Analysis Methods(6学时)
熟练掌握专业英语词汇,要求能借助科技英汉词典翻译全文。
专业英语知识:专业英语的词汇特点I(掌握)
Exercises:独立完成并上交。
Section 6 Sinusoidal AC Circuit Analysis and Three Phase Circuits(6学时)
熟练掌握专业英语词汇,要求能借助科技英汉词典翻译全文。
专业英语知识:专业英语的词汇特点II(掌握)
Exercises:独立完成并上交。