1 / 64
文档名称:

给排水专业毕业设计论文(全).doc

格式:doc   页数:64页
下载后只包含 1 个 DOC 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

给排水专业毕业设计论文(全).doc

上传人:fxl8 2014/10/17 文件大小:0 KB

下载得到文件列表

给排水专业毕业设计论文(全).doc

文档介绍

文档介绍:摘要
本设计是关于贵州省六盘水市给水排水工程的管网设计,它包括给水排水系统、污水排水系统和雨水排水系统。设计的主要内容和深度应按照基本建设程序及有关的设计规定、规程确定。通常,给水管道系统的主要设计内容包括:设计基础数据(包括设计地区的面积、设计人口数、用水定额)的确定;给水管道系统的平面布置;给水管道系统设计流量计算和水力计算。污水系统采用完全分流制排水系统。污水排水系统的管网设计内容包括划分排水面积,布置管道系统;根据设计人口数和污水定额,计算污水设计流量;根据污水水力计算表进行污水管道的水力计算,确定管径、坡度、流速及埋设深度等设计参数;绘制污水管道平面图和纵剖面图。雨水排水系统的管网设计内容包括划分排水面积,进行雨水管渠定线,确定出水口的位置;划分设计管段,计算各管段设计流量;根据雨水水力计算表进行雨水管渠水力计算,确定管径、坡度、流速及埋设深度等设计参数;绘制雨水管道平面图和纵剖面图。
关键词:排水系统,管道布置,设计参数,水力计算
ABSTRACT
The design is on the LiuPanShui in Guizhou Province, drainage work engineering design includes a water supply and drainage system, a sewage drainage system and a stormwater drainage system. Design of the main contents and depth should be in accordance with the basic constructive procedures and relevant designed rules and procedures. Usually, the main designed content of water supply pipeline system includes: basic designed data (including the area of the design area, designed population and water quota) determination; The layout of Water supply pipeline system; Design flow calculation and hydraulic calculation of Water supply piping system. Sewage system pletely separate and drainage system. The work design content of the sewage drainage system includs the division of the drainage area, layout of piping systems; population and sewage fixed according to the design, calculation of sewage design flow; hydraulic calculation of the sewers, the sewage putation to determine the diameter, slope, flow rate and buried depth of the design parameters; draw the sewage pipeline plan and profile maps. Stormwater drainage system work designing content includs division of the drainage area for rainwater sewers, fixing line, determing the outlet location; dividing designed tube segment, calculating each pipe segment design discharge; rain putation conduct rainwater pipe channels cut to divert force calculation, and determine the diameter, slope, and flow rate and burial depth design parameters; draw rainwater pipeline plan and longitudinal section dia