1 / 15
文档名称:

工人英文自我评价-工人自我评价.docx

格式:docx   大小:34KB   页数:15页
下载后只包含 1 个 DOCX 格式的文档,没有任何的图纸或源代码,查看文件列表

如果您已付费下载过本站文档,您可以点这里二次下载

分享

预览

工人英文自我评价-工人自我评价.docx

上传人:圭圭 2022/3/3 文件大小:34 KB

下载得到文件列表

工人英文自我评价-工人自我评价.docx

相关文档

文档介绍

文档介绍:







共 15 页




  Third, equipment testing and debugging work. In the workshop on the Saudi equipment debugging test, the power plant CNDQ-10 hydrogen production equipment startup sequence, PID parameter settings, have a certain understanding. But also on the working principle of rectification from shallow to deep understanding. Before the test to determine through-cylinder is 90 degrees, tee 180 degrees. Through ball valve modulation off. Jordans pneumatic film regulating valve should do its initial adjustment, debugging process, such as equipment can not reach the system pressure, the actual level does not match with the host computer, pump damage has occurred, should be based on the actual situation of correct investigation.










  Fourth, the future direction of work. Next month focused on the debugging phase of learning. Develop their own ability to find fault. The scene found the problem back to the leadership, more advice. In the future work to make up for deficiencies, work hard to do better.
  工人英文自我评价篇二
  I came to your company in August 2022 to work in accordance with the companys work requirements to work on different types of construction documents. I am in strict accordance with the company management system, found their work in the rigorous, efficiency has improved. The supervision and management of the receiving and archiving of information, ability to identify information has improved. As a supervisor of information I am the main job of the work with the professional supervision of the construction engineers of the project information to make strict the project data is a true reflection of the results of