文档介绍:物流领域供应商要求指南
Supplier Requirements Guide in MP&L Field
◆ 工程变更管理规范
◆ Regulations onf parts problems are caused by supplier m
2) 供应商必须在工程变更实施期确认前告知可能产生的停用零件数量。
2) Supplier should inform us of parts stop volumes before ECN.
3) 供应商向我司提交的停用零件赔偿申请数量必须符合上述CFMA-NJ认定预测订单责任期限的标准。
3) Parts compensation volume applied by supplier should be met the above CFMA-NJ standard.
4) 供应商必须在工程变更切换后两周内提交索赔申请,逾期将不予处理。
4) Supplier can submit compensation application to us after ECN two weeks later, we won't wait if past the appointed tim
3 工程变更切换原则 ECN change principle
1) 供应商必须遵守工程变更切换原则,若未按要求和承诺交付正确的零件,我司物流部将依据《收货故障处理流程》对其
1) Must obey the principle, if not met the requirements and not delivering the parts,our company will penalize the suppli
2) 供应商务必交付与物流系统订单状态一致的零件。Alert和Deviation支持的除外。
2) Supplier should deliver the parts which are in line with logistics ordering sheet, except for alert and deviation.
3) 供应商应确保履行向我司物流部工程变更小组提前告知旧件库存和新件预计交付时间的义务(提前一周以上),严禁供应
3) Supplier should make sure inform our ECN team of delivering timing for old and new stocks in advance(one week at
4) 对于PCN、'C' Type、 Alert或Deviation支持交付的工程变更零件,务必按CFMA要求在零件外包装上贴附‘工程变更’、
4) For PCN、'C' Type、 Alert or Deviation parts, the label of ECN should be pasted on the parts package.
5)对于共同(关联)变更的零件, 供应商应严格遵守物流部规定的交付数量进行备件,并及时补交因质量问题等造成的零
5) For common (association) change parts, sup