文档介绍:竣工验收准备资料
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. 位:编制质量检查报告 建设单位。(5)、建设单位:a、取得规划、公安消防、环保、燃气工程等专项验收合格文件。b、监督站出具的电梯验收准用证。C、提前15日把《工程技术资料》和《工程竣工质量安全管理资料送审单》交监督站(监督站在5日内返回《工程竣工质量安全管理资料退回单》给建设单位)。d、工程竣工验收前7天把验收时间、地点、验收组名单以书面通知监督站。(二)、工程竣工验收必备条件:1、完成工程设计和合同约定的各项内容。2、《建设工程竣工验收报告》。3、《工程质量评估报告》。4、勘察单位和设计单位质量检查报告。5、有完整
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b verti