文档介绍:several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremenrizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
本制度信息
制度名称
广东电网公司生产项目承包商管理方法
制度编号
Q/CSG-GPG 2 10 001-2012
对应文号
版 次
变更概要
修编时间
状态
角色
人员
编写
李端姣、陈海涵、张鸣、赖绮瑄、梁健
初审
会签
陈剑锋、祁福财、、、
审核
麦苗 吴斌
批准
2012/02/10印发
制度信息
2012/02/10实施
Q/CSG-GPG 2 10 001-2012 广东电网公司生产项目承包商管理方法
共 11 页 第 1 页
广东电网公司生产项目承包商管理方法
总则
为加强广东电网公司〔以下简称“公司”〕生产项目的安全、质量、效益和进度管理,标准公司对生产项目承包商管理工作,特制定本方法。
生产项目承包商管理工作应遵循实事求是、科学合理和公平、公正、公开原则。
本方法适用于承接公司生产项目设计、监理、施工、调试、修理、维护等业务的生产项目承包商管理。
承接公司生产技术部归口管理的其他非生产项目承包商管理可参照执行。
标准性引用文件
《承装〔修、试〕电力设施许可证管理方法》〔国家电力监管委员会令第28号〕
《中国南方电网有限责任公司基建工