文档介绍:Item Description Unit Quantity Rate Amount
No
SECTION NO 2 第二部分
BUILDING WORK 土建
g site.
Notes on testing 实验说明
The cost of testing undertaken by the contractor in terms of 实验费用依据SABS 1200 DM 和 SABS 1200 ME
his obligations under clause in SABS 1200 DM and ( 或是批准的同类)。出于质量控制目的,
clause in SABS 1200 ME (or equivalent approved), for 此项应包括取样,恢复取样地点,所有实验设备,
purposes of quality control, including the taking of samples, 劳动力以及各种材料等,所有项目报出总价。
reinstating where samples have been taken, and all testing
equipment, labour, materials, etc, shall be included in the
rates tendered for the various items of work and will not be
paid for seperately.
Carried to collection $
Section No. 2
Bill No. 1 合计
Earthworks
33111/ADD5/KZ/CL
The engineer shall be entitled to take or order extra samples 工程师有权要求额外取样或是工艺的实验。承包商将
and tests on materials or workmanship, as required. The 被支付这些实验费用但必须按照要求的规范来实验,
contractor shall be paid at the appropriate rates for these 否则实验费用由承包商自己承担此费用。
extra tests, provided that such tests indicate compliance
with the required specifications, otherwise the cost shall be
bor