文档介绍:摘要: 建筑安装工程预留预埋阶段普遍存在的质量通病是漏留孔洞、漏埋套管或者预留预埋位置不准确,造成管道或设备安装时凿墙钻洞,影响使用功能甚至破坏结构,留下质量隐患,在施工过程中预留预埋件的数量比较庞大以及在安装过程中构件所需点位的控制,后期过程中后续工人对于构件的保护意识比较差以及预埋构件与其他工作之间的合作衔接是否合理给后续工作带来的不必要。因此, 加强预留预埋阶段的质量控制是提高安装工程的施工质量的关键所在。其主要分析了建筑安装工程预留预埋阶段的主要技术措施,同时,还提出了预留预埋阶段的施工程序,以及在后期对于构件的保护和养护工作等。以及为防止安装工程出现质量通病,要对预留、预埋阶段的质量管理采取一些有效措施,集中精力抓好前期质量管理,强化过程管理。关键词: 施工预埋件建筑安装质量目标 Abstract: Embedded stage reserved for construction and installation quality problems mon drain holes left, missed location of buried pipe or urate reserved embedded, resulting in piping or equipment installed Zaoqiang drill holes, or even affect the use of functional damage to the structure, leaving The following quality problems, and set aside in the construction process relatively large number of embedded parts ponents during the installation of control points required, during the late follow-up to the protection of workers sense for ponents and the ponents are relatively poor and other interface between the work of co-operation is reasonable to bring the necessary follow-up. Therefore, to enhance the quality control stage reserved for embedded installation works to improve the quality of the key. Mainly reserved for construction and installation of the embedded stage of the technical measures, while also proposed the construction procedure reserved embedded stage, and later ponents such as the protection and conservation. And appears to prevent the installation of quality problems, want to set aside, embedded phase of quality management to take some effective measures to pre-concentrate on the quality of management, strengthen process management. Key word: Construction Embedded parts Construction and installation Quality objectives 目录引言................................................................................................................................ 1 1 预留预埋施工前的准备............................................................................................ 1 预留预埋件施工的流程.....................................