文档介绍:several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremenhen with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured2
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
驻地监理工程师意见:
签 名: 日期:
砂砾垫层施工方案
一、分项工程概况
省道运永线永济城区段改线工程第三合同段起讫桩号为K1+250-K1+900,全长650m,拟用砂砾进行垫层铺筑,铺筑厚度为20cm。
二、人员、机械组织机构
1、 人员安排
项目承包人:成 刚 施工负责人: 李晓东
试验室主任:李玉坤 质检负责人: 曹 静
安 全 员:程丽霞 施 工 员: 王红狮
试 验 员:米建明
2、施工人员组织分工
施工队劳动力:40人;
3、施工机械及机具: