several group number, then with b ± a, =c,c is is methyl b two vertical box between of accura, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
第二章 财政扶贫资金工程申报
第四条 申报资格。各市〔州、地〕、有扶贫开发任务的县〔市、市辖区、特区,以下简称县〕、扶贫开发工作重点乡〔镇〕及重点村〔以下简称重点乡、村〕可申报财政扶贫资金工程。
第五条 申报资格。必须在完成工程前期准备工作的条件下申报。工程前期准备工作包括:〔1〕根据扶贫开规划建立工程库,按照先后缓的原那么选择工程;〔2〕工程的勘察、设计、投资概算〔概算标准参照?贵州省财政扶贫资金工程投资补助参考标准?执行〕;〔3〕工程可行性研究、论证及评估、扶贫效益分析;〔4〕确定工程实施单位、工程技术依托单位、工程主管单位等。
第六条 申报程序。财政扶贫资金工程应自下而上逐级申报。各重点乡、村根据本乡、本村扶贫开发规划对工程进行