设计总说明
,贯彻执行了国 家及地方有关工程建设的政策和法规,符合国家现行的建筑工程建设标准、设 计标准和制图标准以parts, one part is calculated, including the engineering quantity calculation, reinforced the list of ingredients, integrated unit price analysis table, valuation of project volume detailed list file and project schedule calculations; another part is the text part, namely the design specifications, including bidding, construction organization design and cost control research.
Calculation of components of the main contents of construction engineering, decoration engineering cost calculation, cost of project by project fee, measures the project cost, project cost, fees and taxes of other components, and the calculated price as determined in all stages of project cost control based on.
Completed the construction drawing budget document will serve as the progress of the project statement compiling important basis, on all stages of project cost system control in construction stage, so that more reasonable cost control.
精品资料,欢迎大家下载!
以上资料仅供参考,如有侵权,留言删除!
Text part is mainly the design specification writing, design content mainly includes the business standard (bid) design, technical standard (construction organization design) design, and cost control research.
bidding
Pavilion Station Street Building 7West area project design, mainly introduced the engineering bid quotation compilation basis, compilation of bidding quotation method and determination of quoted price for bidding.
the construction organization design
First introduced the project profiles, based on the engineering research, make the construction scheme, main works and decoration works construction methods, as well as the construction progress, quality and safety control measures.
the cost control of the construction phase
The first analysis of China's current stage in the construction stage of cost control problems that exist in the process, and then according to these issues and pr