文档介绍:六柱支撑式水塔爆破拆除
六柱支撑式水塔爆破拆除
摘要:介绍了徐州铁矿机械厂六柱支撑式水塔爆破拆除,通过对现场环境和影响倒塌方向因素分析,采用加固措施确保倒塌方向的准确性和后座。爆后水塔定向准确,没有对周围设施造成任何影响,取得了圆满成功。
关键词:加固;水塔;定向爆破
中图分类号: :A 文章编号:
Six Pillar Supporting Type Water Tower Blasting Demolition
WEI Zhong-yi
(1 China mine blasting technology co., LTD Xuzhou 221008, China)
Abstract: Solid Introduced Xuzhou Iron Mine Machinery Factory six pillar supporting type water tower demolition blasting, through the analysis of the site environment and collapse direction influence factors,take the reinforcement measures to ensure the accuracy of the collapse the explosion, water tower is collapsed accurately in a direction, without any impact on the surrounding facilities, and gets plete ess.
Key words: reinforce;water tower;directional blasting
1水塔周围环境与结构
该水塔座落在徐州铁矿机械厂院内,废弃多年,由于年久失修支撑柱部分表皮混凝土脱落,主筋锈蚀,已严重威胁到安全生产。,,等边钢筋砼六柱支撑,×,底部两层被改建为厂内临时用房,环境复杂。,,,。
图1 水塔周围环境
Environment of water tower
2爆破方案选择
由于受水塔周围环境所限只能向西定向倒塌,但是存在以下问题:爆破时水塔只剩倒塌方向背面两个立柱作为支撑点,支撑力难以保证,易形成后座,而且倒塌方向难以控制;水塔倾倒撞击地面后会向两侧支出,,稍有差池,势必会对南侧房屋及高压线造成不利影响。
综合以上所述必须对水塔采取加固措施,在支撑部位增加两个立柱,×,并将倒塌方向向北偏移30度,以确保倒塌方向的准确性和不对南侧厂房及高压线造成影响。
图2 加固位置
Reinforce part
3爆破参数选择
该水塔爆破参数设计主要针对立柱、隔墙进行。