1、在施工区两个方向前1500m、1000m、500m、300m、100m处各设一块“”、“前方施工1km”、 “前方施工500m”、“前方施工300m”和“前方施工100m”标示牌,在施工区前200m设“道路施工”标示牌1块;施工区前100m设“指路”标示牌一块。
2、地面标出限速标志线。
3、在施工区前50m处两个方向各设电子导向牌一块。
4、对有净空高度限制要求的,在进入施工现场的主要路口设立“前方桥梁施工限高”标识牌2块及限高仪1台。
5、对有净空高度限制要求的,在施工区域前后处各设限高门架一道。门架采用钢管制作,底座为1m×1m×3m砼,门架及底座上深红、白色反光纸,门架顶杆上装一排电子频闪灯,两侧底座上各安放一排电子频闪灯。
6、在施工区前500m、400m、300m处的行车道设立三组横向振荡标线,提醒车
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angl