of rural drinking water sources, protection of drinking water sources in rural areas by the end o膜——第一次试验——保护层施工——第二次试验——工程质量验收
 ⑴基层找平层做好后,找平层上应无明显水迹,渗漏处先进行堵漏处理。⑵基层表面应坚实具有一定的强度,清洁干净,表面无浮土、砂粒等污物,表面应平整、无松动,要求抹平压光,对于残留的砂浆或突起物应以铲刀削平。 
⑶阴阳角应抹成半径为50?均匀光滑的小圆角。  
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
⑷穿墙管道及连接应安装牢固,接缝严密,若有铁锈、油污应以钢丝刷、砂纸、溶剂等予以清理干净。
细部附加层施工时,用油漆刷蘸取搅拌好的涂料。在管根部、地漏、阴阳角等容易漏水的薄弱部位均匀涂刷。地面与墙角交接处,涂膜防水卷材上大于或等于50毫米高,常温4小时表干后再刷第二道涂膜防水材料。24小时表干后,进行大面积涂膜防水层施工,。
注意事项: .涂布顺序 应先垂直面后水平面:先阴角处及细部后大面。每层涂抹方向应相互垂直。增强措施:在阴角、管道周围、施工缝及裂纹处等均需增强防水措施,其做法是第一道涂膜施工前在该部位增强涂布一道涂膜。配料  液料和粉料及水按重量配比为1:1:0--(搅拌时间5分钟左右,最好不用手工搅拌)。斜面、顶面或立面上施工为了能够挂住足够的料应不加或少加水;平面施工为了涂膜平整可多加些水。
: 涂膜:
A、用塑料橡胶刮或油漆刷把已混合均匀的涂料有顺序而均匀地涂刮(刷)在基层表面上,厚薄要求一致,第一层