文档介绍:瓷砖损耗算法(Tile loss algorithm)
Reference for the quantity algorithm of floor tiles
800 floor tile
Square number *+1~2e than 800 * 800 of the ground stone).
The stone platoon plan should be drawn according to the site size. Stone material if be inclined shop or other heterotype spread stick, as possible as possible model number, reduce wear and tear.
Stone cutting must be cut by infrared cutting machine.
In order to ensure the consistency of stone pattern and color, every piece of factory stone must be numbered.
A. When the stone is delivered to the construction site, it must be sorted and placed, and the back board shall be distributed by the base (assigned by the special person).
The stone material must be prearranged by number before construction, discover the problem in time, strive for the best result.
When the walls are designed for the elimination of surface or sandstone stones, the surface should be indicated for air pollution control. Sandstone can only be made from Australian rough twill. The protection measures should be done well in construction, and the pattern should be aligned. When the sandstone is jointed with other materials, it can be treated with a beige seam.
When paving, use white cement to fill the slurry.
The hole stone is installed with good non-oily mica or AB glue, which can prevent oil seepage and return to yellow. It is best not to use "502" glue for temporary fixation of the plate.
8. Note the sticktite of microcrystalline stone
It is strictly forbidden to use brittle glue such as AB glue, which is used as A special adhesive for South Korea 一 z/double male" or flexible silicone.
B. the microcrystalline stones are fragile when cut,
All kinds of sizes are best finished by the factory after the factory is finished, the site installation.
9. Precautions for the treatment of stone seams
A. metope domestic stone seams try to use "V" shape to avoid the standard of flatness caused by material problem.
The "V" type of the stone